Workshop 06-08

Air bottle stencil
Air bottle stencil
Brian
Brian making clips for linkage
Hurricane on the moveHurricane on the move - Summer 06
Typical layout of 303 located in wings
Brian
Brian..
Rear inspection hatch
View of rear inspection hatch
Firewall prep
Firewall preparation
Engine frame
Engine frame prior to fitting
Martin & Tony
Martin and Tony fitting firewall

The Hurricane pilot - Toby!!
Matt
Matt fitting tubes
Will & Martin
Will and Martin cleaning underpanel
Steve
Steve with rudder assembly
Rod
Rod and the control boxes
Rod
Rod
George
George fitting long runner
Tony
Tony - firewall
Martin
Martin fitting underfairing brackets
Side view
Side view
Camera plate fitted
Camera plate fitted
Rear of cockpit
Rear view of cockpit
Steve, Mick & Brian
Steve, Mick & Brian working on rudder
Firewall etc
Front view of firewall, header tank etc
Rob & Steve
Rob and Steve checking rudder points
Rob & Steve
Rob and Steve checking rudder points

Fury Mk I


Peter dismantling parts from wreckage

Trevor working on trim wheel

Peter dismantling cluster joints

Trevor on trim wheel

View of fish plates

Recovered fuselage

Trim wheel

Plates on fuselage

Plates on fuselage

Plates on fuselage

Rear end of fuselage

Gerry working on fuselage

Gerry working on fuselage

Basic layout of fuselage. Note Watts propellor under framework
Gerry
Gerry

 Previous                            Next